The restoration of Lake Puurijärvi

The restoration of Lake Puurijärvi continues

The largest and most challenging phase of the restoration of Lake Puurijärvi has started. The building of the dam in the south end of the lake and of the almost one kilometer long embankment is in progress.

The excavation continues, as well. The work goes on in the south end of the lake for the whole spring and summer. The south end has the scarcest bird population and the work is done so that disturbance for the birds is as small as possible. The restoration is planned to be finished by the end of the autumn.

Read the full story on http://www.ymparisto.fi/default.asp?node=25348&lan=en